05 Jul, Saturday
My lights were delivered by Davis from Crown lighting on Thurs evening.. and by right Dennis has arranged for the electrician to do up the lights on Friday.. But..
I waited.. until the electrician came only to tell me he got smth urgent today.. tmr (Sat) then he ask someone to start.. no choice lor.. Fio even took half day off cos she so excited abt the lights.. and also she wants to tok to Dennis.. but end up nothing to see..
So.. we start to do some area cleaning for the whole house.. pack up, sweep, vacuum and mop.. After few hours of thorough area cleaning.. Whao..
for the second time our house is so clean.. (the first time was when the wet works were done, before carpentry, Dennis hired Bangla to wash our whole house)
So came Saturday.. as promised.. the electrician came..
After discussing with the electrician.. the positions of my PLC downlights are confirmed..
Step 1: Laser onto the wall and ceiling for accuracy..
Step 2: Mark out the position and size of the downlight..
Step 3: Cut along dotted line..
Step 4: In search for the lighting point wires.. and exposing them.. (some quite difficult to find)
Step 5: Installing the ballast and wiring..

Lastly: Fixing them up..
In the meantime, my other room lights are up..
Kitchen
Bedroom 2 Bedroom 3
HHS, and both toilets the same lights..
MBR cosy corner light.. (Fio bought it)
The electrician were almost done and abt to leave soon.. Me also going to leave le when my solid surface came.. It was heavy and need 4 strong guys to transport.. the worst thing is that the solid surface could not fit into the lift and they had to take the stairs.. oh my god..
All of them were panting their breathes away.. and sweating.. poor thing..
Our lovely white solid surface top..
More updates to come..