Sunday, June 15, 2008

:: Quick updates .. ::

Bz bz bz.. i've been trying to juggle with both wedding plans and reno. Jef is away for a week so i've been on my own.

Went to IT fair to checkout TV for our room.. but was quite disappointed.

Some updates for our reno progress ... Air-con trunking is up, foyer tiles are done and wall are partially painted.

Week 3, Air-con trunking :
Dennis did quite a pretty job for this. The pipes are okay esp for MBR.
One important lesson learnt from Dennis - For air-con, the pipes needs to be place top of the aircon bcos water cannot flow upwards. If the air-con man does the opp, the air-con will probably have problems in the near future.. like water leak, no cold etc.. Ohh.. i do hope i have explain this correctly cos im not so much of a technical person, Jef is so much beta but he is not in town to explain all.. paiseh ar.. >.<

Bedroom 2

Bedroom 1..


The air-con ledge @ MBR


At MBR.. but this will be well hidden by our platform..


Week 4, Foyer tiling done :
I like the black tiles! Its rough surface with a little bit of glittering..
Jef wanted some designs with the black & white tiles soo Dennis have suggested to do like this..


Week 4 , painting work :
For our house, we have chosen all the natural colors as we wanted something cosy. I tink the paint work was alright but have yet to confirm as some parts were not painted yet..

Living/Dining area ..A cool and spacious color chosen for our 2 rooms ..
We didnt want our home to be too colorful, so have stick to the same color.

Our MBR.. 2 color tones.. natural n cosy feel.

Cant wait for Jef to return to do more shoppings for our wedding and reno..

Fio =)

No comments: