I'm looking for a similar kind in white.. where can i find??
Jef

I'm looking for a similar kind in white.. where can i find??
Jef

The position of my existing doorframe and door also hacked & removed
Another view
Now my MBR looks so spacious..
View from where i'll sleep..


its very heavy and bulky.. thank god we were from the same block only different floors.. and both our unit near the lift.. whew..
Dun worry.. with the help of 1 screwdriver and allen key..
Just unscrew the keyhole from my existing door..
And fix it to the left swing door.. there it is..
A screw driver and allen key shall do the job.. and.. Ta Dah!! I've got a left swing door with lock.. yeah.. hee..
Thank you friendly neighbour for ur door..
Also, the cement screeding was done up for bedroom 2 and 3..


Hmm.. saw my homogeneous tiles.. Almost forgot how my tiles look like cos the last time i went to choose was in Apr.. Seems like when i saw in the shop was much more shiny.. Now i see in my house looks dull.. Maybe due to the lighting at the shop..

Wow.. raise the floor by so thick..
Did an angle cut.. cool huh
Layer by layer, the tiles are laid..
When i showed Fio, the pics i took this morning, she was curious how the flooring works was done.. She saw water and sand and told me: "orh.. so water plus sand = cement"
I was like dunno to faint or laugh first.. but replied: "eh like that everytime rain, East Coast and Sentosa beach will become cement le.." Hee..
Anyway, told her on top of sand also got some other materials - mixture of sand, water, cement and some got white powdery stuff...
In between, i went to HDB to press them for the approval for the hacking of wall.. Cos i just cant get through their line..
After much perseverance, i manage to hunt down the person in-charge. They told me they would arrange for the person to come down earliest is 30 May.. ok.. at least i got an answer..
Dad came to view my reno.. and i showed him ard the neighbourhood.. and also the HDB habitat forum.. Show him how HDB flats look like nowadays.. and how they design it..
When we returned, the tiles were all up.. and the worker is just cleaning it.. wow..
Worker doing some touch up..
Done.. the concrete slabs are used as weights.. looks rather unsightly.. Fio and me felt that it looked like.. er u know i know.. dun wanna say much.. in case touch wood..

L-box lights at Dining/TV area
Points at MBR
Day 3,
23 May
Today, the false ceiling will be up.. Always wonder how a false ceiling is being fixed up. There are 2 workers.. Guess one of them is the sub-con who lias with my ID. Both from M'sia as their accent were pretty strong. Quite friendly and easy-going.. funny guys who like to joke and sing.
Dennis did came up to have a look. Update me some of the stuffs.. I'm still waiting for the wall to be hacked. According to Dennis, the HDB is the one delaying it.. we already found a PE le.. Hurry up HDB!!
The 1st piece of L-Box/ False ceiling
Zoom in view
Pelmet for cove lighting @ Living Area
False Ceiling @ MBR
And Its up!!
Eee.. the ugly exposed gas pipe.. Now u see it..
Now u dont.. Hee
Extension for the switch for TV
Went home then suddenly realised that there is no gap at the false ceiling in the MBR for our curtain. Faster called up Dennis to tell him.. He said he will rectify it..
False ceiling without curtain gap
24 May,
As scheduled, today the whole false ceiling and L-Box will be up.. Went to see in the morning.. indeed the worker made a L shape space. ![]()
Done!~ 
Returned in the evening around 5pm plus.. and the workers are still doing.. wow.. they must have had a long day.. 95% of the ceiling works done. A little more touch up. Even the partition is up and i requested for a partition head (circled in red).. But i guess they'll do another day..

Next week will commence on the flooring.. Hope the guy in charge of hacking the wall turns up. I dun wanna drag this any longer..
Jef